https://urkesh.org/MZ/A/A15/D/X/XF/DF2-FA.htm

Unit Book A15

The Reception Area (Version 1a)

Typological index with Frequency Computations
Installations and deposits
typologically by definition

Processed on 2024-12-10
Included here are stationary elements or features, which can be divided into
The main typological categories (surfaces, build-up, etc.) are listed according to types as defined in the pertinent section of the Grammar.


Category Total Percentage Definitions Sub-Total Percentage
buildup 238 40% accumulation 141 59%
accumulation A 14 6%
accumulation B 2 1%
accumulation C 42 18%
accumulation D 6 3%
band 1 0%
layer 14 6%
lens type a 1 0%
lens type b 2 1%
lens type c 4 2%
lens type d 1 0%
topsoil 10 4%
fill, dumping, collapse 50 8% brickfall 11 22%
fill 36 72%
gully 3 6%
installation 226 38% baulk 3 1%
bench 4 2%
bin 2 1%
brick installation 2 1%
burial 10 4%
courtyard 2 1%
cut 22 10%
doorway 3 1%
drain 1 0%
grave 8 4%
hearth 2 1%
house 2 1%
installation 10 4%
isolated individual brick 13 6%
isolated stone 2 1%
kiln 4 2%
oven 1 0%
pit 9 4%
pit aggregate 11 5%
pit cut 9 4%
platform 3 1%
room 15 7%
stair 2 1%
stone installation 7 3%
tannur 3 1%
tannur (feature) 5 2%
wall 67 30%
wall face or plaster 3 1%
well 1 0%
surface 84 14% floor, type a 9 11%
floor, type b 7 8%
floor, type c 5 6%
floorsurface in general 17 20%
packing 1 1%
pavement 4 5%
pavement, type a 1 1%
pavement, type b 18 21%
pavement, type c 19 23%
subfloor 3 4%
uncertain 1 0% uncertain 1 100%
unknown 1 0% unknown 1 100%
Total 600 100%

buildup > band




Total: 1

uncertain




Total: 1

unknown




Total: 1