https://urkesh.org/MZ/A/A06/D/X/XF/DF2-FA.htm

Unit Book A6

The Palace Kitchen (Version 1a)

Typological index with Frequency Computations
Installations and deposits
typologically by definition

Processed on 2026-09-15
Included here are stationary elements or features, which can be divided into
The main typological categories (surfaces, build-up, etc.) are listed according to types as defined in the pertinent section of the Grammar.


Category Total Percentage Definitions Sub-Total Percentage
buildup 193 64% accumulation 17 9%
accumulation A 7 4%
accumulation B 1 1%
accumulation C 149 77%
layer 7 4%
topsoil 12 6%
fill, dumping, collapse 20 7% brickfall 3 15%
fill 6 30%
fill in primary context 3 15%
fill in secondary context 5 25%
gully 3 15%
installation 66 22% bench 1 2%
burial 3 5%
doorway 1 2%
drain 1 2%
hearth 1 2%
isolated individual brick 7 11%
isolated stone 1 2%
kiln 1 2%
pit 16 24%
platform 5 8%
structure 3 5%
tannur 10 15%
wall 15 23%
well 1 2%
other features 4 1% hole 1 25%
mixed features 1 25%
rodent hole 2 50%
surface 8 3% floor 6 75%
floor, type a 1 12%
pavement, type b 1 12%
unknown 9 3% unknown 9 100%
Total 300 100%