https://urkesh.org/MZ/A/J03/D/X/XF/DF2-FA.htm

Unit Book J3

The Terrace Edge, Center (Version 1a)

Typological index with Frequency Computations
Installations and deposits
typologically by definition

Processed on 2024-12-10
Included here are stationary elements or features, which can be divided into
The main typological categories (surfaces, build-up, etc.) are listed according to types as defined in the pertinent section of the Grammar.


Category Total Percentage Definitions Sub-Total Percentage
buildup 156 28% accumulation 2 1%
accumulation A 1 1%
accumulation B 2 1%
accumulation C 4 3%
accumulation D 100 64%
laminations 2 1%
layer 16 10%
lens 1 1%
lens type a 1 1%
lens type c 1 1%
lens type d 1 1%
packing 1 1%
topsoil 24 15%
fill, dumping, collapse 24 4% collapse 1 4%
fill 23 96%
installation 328 58% apron 4 1%
brick installation 4 1%
burial 5 2%
fill 1 0%
glacis 5 2%
installation 15 5%
isolated individual brick 2 1%
isolated stone 143 44%
pit aggregate 7 2%
pit cut 3 1%
platform 1 0%
stone installation 133 41%
tannur (feature) 1 0%
wall 4 1%
other features 27 5% installation 1 4%
isolated stone 17 63%
rodent hole 3 11%
volumetric material 6 22%
surface 29 5% floor, type b 6 21%
floor, type c 2 7%
floor, type d 5 17%
packing 10 34%
pavement 1 3%
pavement, type b 2 7%
pavement, type c 3 10%
Total 564 100%

buildup > lens




Total: 1