https://urkesh.org/MZ/A/A20/D/X/XF/DF1-FA.htm

Unit Book A20

Typological index with Frequency Computations
Installations and deposits
by definition

Processed on 2024-09-10
Included here are stationary elements or features, which can be divided into
Click on column headers to change sort order.


Definition Total Percentage Histogram
accumulation 9 4%
accumulation A 8 4%
accumulation B 4 2%
accumulation C 7 3%
accumulation D 8 4%
bin 1 0%
brick installation 1 0%
brick pile 2 1%
brickfall 7 3%
cut 1 0%
fill 11 5%
floor, type a 1 0%
floor, type b 10 5%
floor, type c 1 0%
hearth 1 0%
installation 6 3%
isolated individual brick 1 0%
isolated stone 2 1%
layer 26 12%
lens 3 1%
pavement, type b 6 3%
pavement, type c 19 9%
pit cut 2 1%
room 4 2%
stone installation 15 7%
tannur (feature) 2 1%
topsoil 14 7%
volumetric material 4 2%
wall 39 18%
Total 215 100%

bin




Total: 1

brick pile




Total: 2

cut




Total: 1

floor, type a




Total: 1

floor, type c




Total: 1

hearth




Total: 1

lens




Total: 3

pit cut




Total: 2

room




Total: 4