2. IDENTIFICATION
Designation
| Roster | Date | Author | Record |
|---|---|---|---|
| Description (summary) | 2025-05-30 | pC | Main construction phase of the Temple Terrace [Input: ZJ530pC.j] |
3. STRATIGRAPHY
Time Sequencing
| Roster | Date | Author | Record |
|---|---|---|---|
| Features included within stratum | 2025-05-30 | pC | f24 (wall) f27 (wall) f218 (wall) f219 (wall) f227 (wall) [Input: ZJ530pC.j] |
| Phase (to which element belongs) | 2025-05-30 | pC | h3mJPD [Input: ZJ530pC.j] |